Norske Shell EPTT 4152
Kollsnes, Norway Norway
Nov 1995 - Apr 1996
Assigned to the Troll onshore gas/condensate terminal mechanical completion team. Responsible for the inspection of the plant instrumentation; preparation of engineering clarification documents; liaison with main engineering consultants and installation sub-contractors.