Det Norske Veritas Engineering (Veritec)
Stavanger, Norway Norway
Jul 1993 - Jul 1994
Assigned to the Phillips Petroleum Co. Norway (PPCON) Ekofisk task-10 project. Responsible for the modification of the existing temperature control system on the 2/4 tank platform to upgrade to revised hazardous area classification; specification of intrinsic safety equipment and revision to existing loop and panel drawings. Engaged on the Elf Norge petroleum Froy tie-in project. Responsible for the instrument support on the mechanical and safety packages, including: Frank Mohn water-injection pumps, ETA deaeration, Sultzer crude-oil export pumps; support to mechanical completion group for the preparation of mechanical acceptance records.