Senior/Lead Instrument Engineer

KCI Engineers

SCHIEDAM, The Netherlands The Netherlands

Jul 2018 - Oct 2019

Assigned to the TAQA Petroleum P15-D oil & gas platform (Dutch sector) engineering design revamp team. Responsible for the creation/supervision of the instrumentation documents associated with new platform pipeline tie-ins: data sheets, I/O list, instrument schedule and loop/wiring diagrams. Assisted with the KCI detail engineering proposal for the Bluewater Haewene Brim FPSO Pierce Depressurization Project.